Energy to cover Transmission System Losses

Pursuant to Article 29, Paragraph 15 of the Electricity Market Act (Official Gazette no. 22/13, 95/15, 102/15, 68/18 i 52/19), Croatian Transmission System Operator Ltd.  (HOPS) is obliged to purchase energy to cover transmission system according to transparent, non-discriminatory market based procedures.
Covering of Transmission System Losses – covering the losses incurred on the system between the power station generating unit and the grid supply points. The energy required to cover transmission system losses is procured bilaterally or on the power exchange.